Outages are vastly different from normal plant operations and require a different planning & execution process.

Turnkey Outages

TheOutageExpert™ ‘s proprietary construction planning and execution processes:

  • ZoneOutageControl™ will

    • Reduce cost and schedule by 10% per outage for three outage cycles

    • Give you cost to date and cost to finish within 5% four hours after the end of each shift

    • Reduce and eventual eliminate close out mistakes that bring the unit down after start up

  • TheExperts™ ‘s for the best information on each piece of equipment in the plant

    • TheExperts™ is a strategic alliance of over 40 companies that operate & maintain power plants. This gives us the best information on all of the equipment in a plant.

How it Works:

Once we agree on scope we will give you a guaranteed price and schedule for your outage with business interruption insurance if we do not hit the mark.

As Always, We Also Offer:

LTSA’s on Existing Equipment

  • De-risk physical plant operation

  • Stabilize cash flow

  • Insulate owner from employee risk

  • Provide equipment & operations insurance to lower owner’s insurance costs

  • List of eligible equipment

Consulting

  • Technical

  • Management

  • Operations

  • EBITA